How to Track Which Stage Each Factory Order Is In
A board with five columns, one card per order, and one rule: only the person doing the work moves the card. Here's how to set it up in a small factory.
It's 10:20 a.m. and the phone rings in the factory owner's office. A customer wants to know about the order of forty shirts that was supposed to ship this week. The owner can't answer. He gets up, walks down to the sewing floor, and asks the supervisor, who says the cutting hasn't all come over yet. He goes to the cutting room to check, stops by finishing to see if there's room for this order, and comes back to the phone twenty minutes later. The customer has already hung up.
To know what stage each order is in without asking anyone, you need a board everyone can see with a few columns, one card per order, and one rule: only the person who did the work moves the card. You don't need software to start, and answering the customer takes as long as it takes to look at the wall.
Five columns, no more, no fewer
Picture a small clothing factory with three departments: cutting, sewing and finishing. The board has one column for each step the order goes through, plus two for the ends: "Received" and "Ready." That makes five: received, cutting, sewing, finishing, ready.
Each column answers a question the customer asks on the phone. Received means the factory has the order, but nobody has picked it up yet. Cutting, sewing and finishing tell you which department has it. Ready means it can be picked up or shipped.
When a board has ten or twelve columns, nobody keeps it updated, because nobody knows which column the card belongs in. If your factory has one extra step, like printing or quality control, add a column. Add it only if that step is a place where orders really do sit and wait.
The card: what to write on each order
Each order is a card, and the card has to be readable at a glance. Write only what someone walking by needs to know:
- the customer's name and the order number;
- what it is and how many pieces;
- the date promised to the customer;
- a short note if anything is out of the ordinary (fabric missing, a change the customer asked for).
Everything else, like measurements, drawings and email threads, goes in a folder with the order number on it. The card points to the folder and doesn't replace it.
The promised date is the part that helps most. When the Example Company card is in sewing and the date is Thursday, anyone walking past can see whether there's slack or the schedule is tight, without asking.
Who moves the card
This is the rule that makes the board work: only the person doing the work moves the card. The seamstress who finishes the last batch moves the card from "sewing" to "finishing." It isn't the owner or the office clerk who does it at the end of the day, based on what they heard in the hallway.
There's a practical reason. Someone who updates the board at the end of the day, from memory, updates it half a day late and with a few mistakes. Someone who moves the card the moment they put the piece down does it with the work still in their hands, and the board shows what is happening right now.
This also settles the question of two people touching the same order. Each department only touches the cards in its own column. The card in "cutting" belongs to cutting. When it moves to sewing, it belongs to sewing. On a paper board, nobody picks up a card that isn't in their column. On a shared spreadsheet, the same applies: each department edits its own rows and no others.
For the rule to stick, the board has to be where people walk by, and moving a card has to take ten seconds. If the board is in the office and the sewing floor is downstairs, the moving stops happening.
Paper, spreadsheet or software
A corkboard or a magnetic whiteboard on the wall by the entrance to the departments is the fastest to set up. You can see it from across the room, it doesn't need a password, and it doesn't go down when the internet does. It can't alert anyone, and only people in the factory can see it.
A shared spreadsheet solves the problem for people who aren't on site: the owner in a meeting, the salesperson at a customer's office. Each order is a row and one column shows the stage. The cost is that someone has to open the file, and on the factory floor that almost never happens with the same discipline as moving a magnet.
Software built for this shows the same board on a screen, lets each department change only its own cards, and can send an alert when a card sits still. It pays off when the orders are already many, when there's more than one shift, or when customers want to check the status themselves. If you'd like to see how this gets set up in a company, the companies page explains what GoApexi does in this area.
Start with paper. If after a few weeks the board is used every day, moving to software only changes the medium, because the team already knows the rule. If it isn't used on paper, it won't be used on a screen either.
Warning the customer when an order will be late
The board shows a delay before it happens. A card with a Thursday date that is still in "cutting" on Tuesday is already at risk. Agree on one simple thing with your team: whoever sees a card at risk tells the person in charge of orders, who calls the customer that same day.
A customer takes a warned delay better than a discovered one. A short message with the new date and the reason in one sentence is usually enough:
Good morning, this is Example Factory. Your order 0123 will ship on Friday instead of Thursday because the fabric arrived a day late. If you need the date confirmed for something else, call us at 9XX XXX XXX.
Write the new date on the card and cross out the old one, so whoever answers the phone next says the same thing. If the factory runs several shifts, the board also helps at the handoff between crews, as you can see in factory shift handoff: how to do it in ten minutes.
The first two weeks
In the first week, put only new orders on the board. Don't spend time copying over everything that's already in progress, because what's in progress will finish in a few days and drop off the board on its own.
In the second week, notice who forgets to move the card and why. It's usually one of two things: the board is too far away, or the person thinks the card is the office's problem. Move the board or explain the rule again. A five-minute talk at the start of the shift does more than a written notice.
After two weeks, the phone rings and the owner looks at the wall.
If you'd like to set up this board in your factory, or find out whether you're ready for software, book the free GoApexi assessment and we'll talk about your situation, with your departments and your orders.
Frequently asked questions
What is the simplest way to follow orders?
A board on the wall with five columns (received, cutting, sewing, finishing, ready) and one card per order. Anyone walking by can see what stage each one is in, without asking anyone and without opening a file.
How many stages should the order board have?
As many as there are places where an order really sits and waits, usually between four and six. More than that makes the board hard to keep up, and the team stops knowing which column to put the card in.
Who should update the status of each order?
The person doing the work, the moment they finish it. If the update is left to the office or to the end of the day, the board shows what happened yesterday and not what is happening now.
How do you keep two people from changing the same order at the same time?
Each department only touches the cards in its own column. When the work moves to the next department, the card moves with it and stops belonging to the previous one. On a spreadsheet or in software, the rule is the same: each department edits only its own rows.
Was this article helpful?